PT-1 TIME RELEASE PAN TREATMENT UP TO 2.5 TON
PT-1 TIME RELEASE PAN TREATMENT UP TO 2.5 TON
- Protection: Prevents slime, fungus, mold, and algae buildup that causes clogged drain lines and water damage.
- Corrosion Inhibition: Contains inhibitors to prevent the premature failure of metal drain pans.
- Deodorization: Neutralizes foul, musty odors and adds a light, pleasant scent to the air.
- Long-Lasting: A single treatment typically lasts up to 3 months of continuous operation (or up to 6 months in some environments).
- Placement: Place the PT-1 unit directly into the condensate drain pan.
- Positioning: Locate it between the evaporator coil and the drain opening.
- Optimal Distance: Position it as far from the drain opening as possible while still intercepting the path of the water flow.
- Security: The product is typically enclosed in a polyester "sock" that absorbs water and keeps it stationary in the pan.